湿陷性黄土地区水泥改良土路床的现场试验研究

金明亮*1,*, 韦正鹏2,3   

  1. 1.甘肃二车高等级公路项目管理有限公司, 甘肃 环县 745700;
    2.甘肃省交通规划勘察设计院股份有限公司, 甘肃 兰州 730030;
    3.甘肃畅陇公路养护技术研究院有限公司, 甘肃 兰州 730030
  • 收稿日期:2022-05-19 出版日期:2023-06-28 发布日期:2023-07-07
  • 通讯作者: 金明亮(1981-),男,甘肃甘谷人,高级工程师. Email: jinmingliang2022@163.com
  • 基金资助:
    甘肃省自然科学基金(1308RJZA140)

Study of field test of cement-modified soil road bed in collapsible loess area

JIN Ming-liang1, WEI Zheng-peng2,3   

  1. 1. Gansu Erche High-grade Highway Project Management Co. Ltd, Huanxian 745700, China;
    2. Gansu Provincial Communications Planning Survey and Design Institute Co. Ltd., Lanzhou 730030, China;
    3. Gansu Changlong Highway Maintenance Technology Institute Co. Ltd., Lanzhou 730030, China
  • Received:2022-05-19 Online:2023-06-28 Published:2023-07-07

摘要: 针对路面结构层经常存在的反射裂缝问题,以甘肃陇东地区某高速公路水泥改良土路床工程为背景,通过现场重型击实试验对比研究了普通压路机和大激振力压路机作用下水泥改良土路床施工效果;通过碾压工艺组合与压实度参数实测,获得了大激振力压路机作用下水泥改良土的最佳填筑厚度;通过对路床顶面路面结构层施工工期的不同安排研究了路床放置时间对反射裂缝的影响.结果表明:水泥改良土受水化反应的影响,随着延迟时间的增大,其最大干密度呈降低趋势,而最佳含水率则逐渐增大;采用大激振力压路机强振和提高压实遍数均有利于提高水泥改良土的压实度;由于施工机械的发展,压实厚度可在规范规定限值基础上适当提高;成型后的路床随着放置时间的增加,路面结构层反射裂缝明显减少.试验成果可为水泥改良土路床施工提供参考.

关键词: 水泥改良土, 路床施工, 大激振力压路机, 路床放置时间

Abstract: In order to solve the problem of reflective cracks often existed in the pavement structure layer, the construction effect of cement-improved soil pavement bed under the action of ordinary roller and large vibration force roller was compared by taking the construction of an expressway in Longdong region of Gansu Province as an example. Through rolling combined process and compaction parameters, the optimum filling thickness of cement-modified soil under the action of high vibration force roller is obtained. Through the different arrangement of construction period of pavement structure layer on the top surface of pavement bed, the effective way to reduce the reflection crack is studied. The test results show that: Influenced by the hydration reaction of cement-modified soil, with the increase of delay time, its maximum dry density decreases, while its optimum moisture content increases gradually. It is beneficial to improve the compaction degree of cement-improved soil by adopting strong vibration of high-exciting force road roller and increasing the number of compaction times. Due to the development of construction machinery, the compaction thickness can be appropriately increased on the basis of the limit specified in the specification. The reflective cracks of the pavement structural layer are obviously reduced with the increase of the placement time of the formed road bed. The test results can provide reference for the construction of cement improved soil road bed.

Key words: cement-modified soil, road bed construction, large vibration force roller, road bed placement time