[1] YANG Li,YE Zhisheng,LEE C G.A two-phase preventive maintenance policy considering imperfect repair and postponed replacement[J].European Journal of Operational Research,2019,274(3):966-977. [2] REZAEI M M,SIADAT A,DANTAN J Y.An approximation approach for an integrated part quality insp ection and preventive maintenance planning in a nonlinear deteriorating serial multi-stage manufacturing system[J].I-FAC Papers on Line,2018,51(11):270-275. [3] LU Biao,ZHOU Xiaojun.Opportunistic preventive maintenance scheduling for serial-parallel multistage manufacturing systems with multiple streams of deterioration[J].Reliability Engineering and System Safety,2017,168:116-127. [4] CHALABI N,DAHANE M,BELDJILALI B.Optimisation of preventive maintenance grouping strategy for multi-component series systems:Particle swarm based approach[J].Computers &Industrial Engineering,2016,102:440-451. [5] 周炳海,林松.基于批量生产模式的混联系统双导向机会维护建模[J].哈尔滨工程大学学报,2018,39(8):1382-1388. [6] 刘繁茂,朱海平,邵新宇.一种基于马尔可夫链的多设备串并联系统视情机会维修策略[J].中国机械工程,2009,20(7):851-855. [7] JOEL I,KAZEM A,IKE A.A systems approach towards reliability centred maintenance of wind turbines[J].Procedia Computer Science,2013,16(1):814-823. [8] DERIGENT W,THOMAS E,LEVRAT E.Opportunistic maintenance based on fuzzy modelling of component proximity[J].CIRP Annals Manufacturing Technology,2009,58:29-32. [9] 张小杰,陶辛阳,夏唐斌.基于约束理论的串联型港口装卸系统多机机会维护方法[J].工业工程与管理,2017,22(5):54-58. [10] 张晓文,孙小明,蒋祖华.考虑生产线平衡的串/并联生产系统机会维护策略[J].上海交通大学学报,2015,49(5):702-707,713. [11] 张晓文,蒋祖华,胡家文.基于约束理论的多阶瓶颈串/并联系统的机会维护[J].哈尔滨工程大学学报,2016,37(9):1275-1280. [12] 李有堂,李 晶,黄兆坤.多资源约束下串/并联生产系统的机会维护策略[J].兰州理工大学学报,2019,45(5):33-38. [13] 夏唐斌,奚立峰,周晓军.串并联衰退系统的多目标预防性维护优化建模[J].计算机集成制造系统,2010,16(4):783-788. |