Architectural Sciences

Analysis on reinforcement effect of recyclable positioning grouting anchor pipe crossing shallow buried water-rich section of tunnel

  • ZHU Sheng-xiang ,
  • ZHENG Xiao-jing
Expand
  • 1. Gansu Road and Bridge Highway Investment Co., Ltd., Lanzhou 730050, China;
    2. Gansu Gonghanglu YongJi Expressway Management Co., Ltd., Lanzhou 730050, China;
    3. Gansu Traffic Construction Project Management Co., Ltd., Lanzhou 730050, China

Received date: 2024-07-10

  Online published: 2026-09-03

Abstract

Taking two shallow-buried, water-rich sections of a tunnel with similar geological conditions as the engineering background, a recyclable positioning grouting anchor pipe was developed and applied to the second section after conventional pipe-shed reinforcement used in the first section proved ineffective in terms of both reinforcement and water sealing. During construction, advanced geological prediction radar images were used to assess the degree of rock-mass fragmentation after reinforcement, while construction difficulty was evaluated based on process duration and excavation conditions. The consolidation effect on fractured surrounding rock was examined through visual observations of the tunnel face and changes in the BQ value before and after reinforcement. Water-sealing performance was evaluated according to the water-outflow condition at the tunnel face and variations in seepage volume, and the overall stability of the surrounding rock was assessed through monitoring of displacements inside and outside the tunnel. A comprehensive comparison was conducted in terms of advanced geological prediction, construction process, rock-mass consolidation, seepage variation, and settlement monitoring. The results show that, compared with pipe-shed reinforcement, the positioning grouting anchor pipe can significantly reduce rock-mass fragmentation, improve the surrounding-rock grade, decrease internal and external tunnel displacements, shorten deformation convergence time, enhance water-sealing performance, and markedly accelerate construction progress.

Cite this article

ZHU Sheng-xiang , ZHENG Xiao-jing . Analysis on reinforcement effect of recyclable positioning grouting anchor pipe crossing shallow buried water-rich section of tunnel[J]. Journal of Lanzhou University of Technology, 2026 , 52(4) : 138 -145 . DOI: 10.13295/j.cnki.issn1673-5196.2026.04.016

References

[1] 张小波,荣耀,张雕,等.考虑初支滞后性的软弱地层隧道进洞段管棚注浆加固效果研究[J].公路,2024,69(8):425-433.
[2] 姬云鹏,房灵国,唐昊天,等.隧道开挖全过程管棚支护受力研究[J].现代隧道技术,2023,60(3):123-138.
[3] 张永辉,胡志平,李芳涛,等.砂质页岩隧道洞口浅埋段变形特征与控制措施研究[J].公路交通科技,2023,40(6):155-163.
[4] 王琳,杨林,袁青,等.浅埋富水隧道施工大变形原因分析与应对措施[J].人民长江,2022,53(5):162-167.
[5] 焦卫宁,鄢稳定.特殊地质条件下隧道突水涌泥段超前加固措施研究[J].公路交通科技(应用技术版),2020,16(2):260-263.
[6] 伍振志,傅志锋,王静,等.浅埋松软地层开挖中管棚注浆法的加固机理及效果分析[J].岩石力学与工程学报,2005,24(6):1025-1029.
[7] 赵立财.浅埋大跨公路隧道穿越富水软弱土层施工关键技术[J].中国工程科学,2015,17(1):81-87.
[8] 来弘鹏,谢永利,杨晓华.地表预注浆加固公路隧道浅埋偏压破碎围岩效果分析[J].岩石力学与工程学报,2008,27(11):2309-2315.
[9] 甘肃公航旅永积高速公路项目管理有限公司.可回收定位注浆锚管及定位注浆锚固方法:CN202111365755.8[P].2023-08-04.
[10] 雷军,张金柱,林传年.乌鞘岭特长隧道复杂地质条件下断层带应力及变形现场监测分析[J].岩土力学,2008,29(5):1367-1371.
[11] 靳晓光,王兰生,卫宏.公路隧道围岩变形监测及其应用[J]. 中国地质灾害与防治学报,2000,11(1):19-23.
[12] 黄宏伟,徐凌.大风垭口岩石公路隧道围岩及初期支护变形与内力研究[J].岩石力学与工程学报,2004,23(1):44-52.
[13] 沙鹏,伍法权,李响,等.高地应力条件下层状地层隧道围岩挤压变形与支护受力特征[J].岩土力学,2015,36(5):1407-1414.
[14] 孙瑞峰.隧道施工中的变形监测与控制方法[J].工程建设与设计,2022(11):182-184.
[15] 张伟,乔雄,骆维斌,等.分部开挖法施工隧道中隔壁优化研究[J].兰州理工大学学报,2022,48(6):127-135.
[16] 李少华.曲线并行盾构隧道施工控制研究[J].兰州理工大学学报,2022,48(1):128-133.
[17] JTG 3370.1-2018 公路隧道设计规范[S].
[18] JTG/T 3660-2020 公路隧道施工技术规范[S].
Outlines

/